BYD Atto 3 road trip cost — South Africa

BYD Atto 3 Extended Range (60.48kWh battery) · 15.3 kWh/100km · electricity @ R2.71/kWh

Electricity cost uses Eskom Homelight tariff R2.71/kWh (2026-04-01). Municipal rates may be higher.

EV

BYD Atto 3 Extended Range (60.48kWh battery)

15.3 kWh/100km (WLTP) · electricity cost per trip shown below

Trip costs across all major SA routes

Electricity cost calculated at current electricity price. Toll fees use Class I (standard light vehicle) tariffs. All figures are one-way.

RouteElec.Total
DurbanPort Shepstone

N2 · 1 toll

R 49,76R 90,76
Port Elizabeth (Gqeberha)East London

N2 · 0 tolls

R 124,39R 124,39
PretoriaRustenburg

N4 · 5 tolls

R 49,76R 134,26
JohannesburgRustenburg

N4 · 5 tolls

R 72,56R 157,06
DurbanRichards Bay

N2 · 3 tolls

R 68,41R 165,91
Cape TownGeorge

N2 · 0 tolls

R 178,29R 178,29
East LondonBloemfontein

N6 · 0 tolls

R 233,02R 233,02
Port ElizabethBloemfontein

N9, N1 · 0 tolls

R 275,73R 275,73
JohannesburgeSwatini Border

N17 · 5 tolls

R 136,83R 289,83
PretoriaZeerust (Botswana border)

N4 · 6 tolls

R 109,88R 297,38
DurbanEast London

N2 · 1 toll

R 290,24R 331,24
PretoriaPolokwane

N1 · 4 tolls

R 120,24R 352,74
JohannesburgBloemfontein

N1 · 3 tolls

R 165,85R 363,35
Cape TownPort Elizabeth (Gqeberha)

N2 · 1 toll

R 310,97R 383,97
JohannesburgNelspruit (Mbombela)

N4 · 3 tolls

R 149,27R 410,27
DurbanBloemfontein

N3 · 3 tolls

R 265,36R 451,86
DurbanPort Elizabeth (Gqeberha)

N2 · 1 toll

R 414,63R 455,63
BloemfonteinCape Town

N1 · 1 toll

R 414,63R 469,13
Cape TownEast London

N2 · 1 toll

R 435,36R 508,36
PretoriaBeit Bridge (Zimbabwe border)

N1 · 6 tolls

R 215,61R 573,11
JohannesburgDurban

N3 · 5 tolls

R 244,63R 592,13
East LondonJohannesburg

N6, N1 · 3 tolls

R 398,87R 596,37
Port ElizabethJohannesburg

N9, N1 · 3 tolls

R 441,17R 638,67
PolokwaneBloemfontein

N1 · 7 tolls

R 286,09R 716,09
BloemfonteinPolokwane

N1 · 7 tolls

R 286,09R 716,09
DurbanRustenburg

N3 · 10 tolls

R 302,27R 734,27
Nelspruit (Mbombela)Bloemfontein

N4, N1 · 6 tolls

R 315,12R 773,62
BloemfonteinNelspruit (Mbombela)

N1, N4 · 6 tolls

R 315,12R 773,62
Cape TownDurban

N2 · 2 tolls

R 717,31R 831,31
JohannesburgCape Town

N1 · 4 tolls

R 580,48R 832,48
Beit Bridge (Zimbabwe border)Bloemfontein

N1 · 9 tolls

R 381,46R 936,46
BloemfonteinBeit Bridge (Zimbabwe border)

N1 · 9 tolls

R 381,46R 936,46
DurbanPolokwane

N3 · 9 tolls

R 363,63R 943,63
PolokwanePort Elizabeth (Gqeberha)

N1, N9 · 7 tolls

R 561,41R 991,41
Port Elizabeth (Gqeberha)Polokwane

N9, N1 · 7 tolls

R 561,41R 991,41
Nelspruit (Mbombela)Port Elizabeth (Gqeberha)

N4, N9, N1 · 6 tolls

R 590,43R 1 048,93
Port Elizabeth (Gqeberha)Nelspruit (Mbombela)

N9, N1, N4 · 6 tolls

R 590,43R 1 048,93
Beit Bridge (Zimbabwe border)Durban

N1, N3 · 11 tolls

R 460,24R 1 165,24
DurbanBeit Bridge (Zimbabwe border)

N3, N1 · 11 tolls

R 460,24R 1 165,24
PolokwaneCape Town

N1 · 8 tolls

R 700,72R 1 185,22
Cape TownPolokwane

N1 · 8 tolls

R 700,72R 1 185,22
Nelspruit (Mbombela)Cape Town

N4, N1 · 7 tolls

R 729,75R 1 242,75
Cape TownNelspruit (Mbombela)

N1, N4 · 7 tolls

R 729,75R 1 242,75
Beit Bridge (Zimbabwe border)Cape Town

N1 · 10 tolls

R 796,09R 1 405,59
Cape TownBeit Bridge (Zimbabwe border)

N1 · 10 tolls

R 796,09R 1 405,59

Electricity cost at R2.71/kWh (Eskom Homelight, 2026-04-01). Municipal tariffs higher.

About the BYD Atto 3's consumption figure: The 15.3 kWh/100km figure is the manufacturer-published WLTP combined-cycle rating for the BYD Atto 3 Extended Range (60.48kWh battery). Real-world consumption varies with speed, climate control and road conditions.

Note: WLTP combined. Trip cost shown as electricity cost, not fuel.

Source: https://www.byd.com/za/car/atto3.html