BYD Atto 3: Durban to Richards Bay cost

BYD Atto 3 Extended Range (60.48kWh battery) · 165 km via N2 · 1h 40m

Electricity at R2.71/kWh (Eskom Homelight, 2026-04-01) · Toll fees: 1 March 2026

One-way trip cost

R 165,91

total cost

R 331,83

return trip (×2)

Electricity cost

R 68,41

25.2 kWh total

Toll fees

R 97,50

3 mainline plazas · Class I

Toll gates on this route

Mainline plazas only — Class I (standard light vehicle / bakkie / SUV).

PlazaClass I
oThongathiR 15.50
MvotiR 18.50
MtunziniR 63.50
Total (one way)R 97.50

Source: foresightpublications.co.za · Tariffs effective 1 March 2026 · 3.12% SANRAL CPI adjustment

About the BYD Atto 3's consumption figure

The 15.3 kWh/100km figure is the manufacturer-published WLTP combined-cycle rating for the BYD Atto 3 Extended Range (60.48kWh battery). Real-world consumption varies with speed, climate control use, and road gradient. The electricity cost uses the Eskom Homelight tariff of R2.71/kWh — your actual cost may differ if you charge at a public station or in a municipality with higher tariffs.

WLTP combined. Trip cost shown as electricity cost, not fuel.

Consumption source: https://www.byd.com/za/car/atto3.html